Orlando,
FL/January 26-30, 2004
Grosvenor Resort, phone (800) 624-4109 (reference code=ASME) |
 |
ASME B31.1 Process Piping
(PD013),
January 26-30 |
 |
ASME Y14.5 Geometric
Dimensioning & Tolerancing (PD092),
January 26-28 |
 |
ASME Boiler & Pressure
Vessel Code: Section XI, Inservice Inspection of Nuclear Power
Plant Components (PD192),
January 26-30 |
 |
Introduction to Piping Systems and
Process Equipment (PD410),
January 26-28 |
 |
Application of Standards
in Boiler, Pressure Vessel and Piping Codes (PD416),
January 29-30 |
 |
Liquid Pipeline Hydraulics,
Level 1 (Introduction) (PD431),
January 26-27 |
 |
Turbo-Machinery Components
and Systems: Dynamic Analysis (PD432),
January 28-30 |
 |
Inspection, Repairs,
and Alterations of Pressure Vessels (PD441),
January 29-30 |
 |
ASME Boiler and Pressure Vessel
Code: Section VIII, Division 1, Design and Fabrication of Pressure
Vessels (PD442),
January 26-28 |
 |
Section VIII - 5 Days (PD443),
January 26-30 |
 |
ASME Section 1: Power Boilers
(PD474),
January 29-30 |
|
|
Cape
Canaveral, FL/February 2-5, 2004
|
 |
ASME A17.1 Safety Code for Elevators
and Escalators (PD010),
February 2-5 |
 |
ASME A17.1 Safety Code for Elevators
and Escalators (PD010a),
February 2-6 |
 |
How To Perform Elevator Inspections
Using ASME A17.2.1 and A17.2.2 (PD102),
February 4-6 |
 |
How To Perform Elevator Inspections
Using ASME A17.2.1 and A17.2.2 (PD102a),
February 2-6 |
|
|
16th
International Clarion Technical Conferences
PIPELINE PIGGING, INTEGRITY ASSESSMENT & REPAIR
Training Courses, Conference, & Exhibition
Westin Galleria Hotel, Houston, TX/February 3-6, 2004
20% Discount for ASME Members
|
 |
Pipeline Pigging Technology, February
3-4 |
 |
Defect Assessment in Pipelines,
February 3-4 |
 |
Pipeline Repair Methods/InService
Welding, February 3-4 |
 |
Direct Assessment, February 3-4 |
|
|
Houston, TX/February
9-13, 2004
Wyndham Greenspoint Hotel, phone (800) 996-3426 (reference code=ASME) |
 |
Heating Ventilating and Air-Conditioning
Systems: Sizing and Design (PD027),
February 9-11 (Save
10%) |
 |
Failure, Failure Prevention &
Repair of Pressure Vessels, Piping, Boilers & Rotating Machinery,
with Life Extension Consideration (PD077),
February 9-11 |
 |
Pump & Valve Selection for
Optimum System Performance (PD171),
February 9-12 |
 |
Waterhammer & Fluid Structure
Interaction in Piping Systems (PD221),
February 9-10 |
 |
Fracture Mechanics Approach to
Life Prediction (PD268),
February 9-11 |
 |
Fastening Systems (PD313),
February 9-10 (Save
10%) |
 |
ASME B31.8 Gas Transmission and
Distribution Piping Systems (PD370),
February 12-13 |
 |
Design of Bolted Flange Joints
(PD386),
February 11 |
 |
Understanding Chiller Performance,
Operation, and Economics (PD387),
February 12 |
 |
Non-Destructive Exaination-Applying
ASME Code Requirements (Section V) (PD389),
February 11-13 |
 |
Tolerance Stack-Up (PD402),
February 12-13 (Save
10%) |
 |
Strategic Planning for Engineers
(PD423),
February 9-10 |
 |
The Bolted Joint (PD446),
February 12-13 |
 |
Advanced Pressure Vessel &
Fabrication, Section VIII, Division 1 (PD447),
February 9-12 |
 |
Geometric Dimensioning & Tolerancing
Certification Exam Preparation (PD458),
February 9-11 |
|
|
Las Vegas, NV/March 8-12, 2004
Harrah's Hotel, phone (888) 458-8471 (reference code=S03ASM4) |
 |
ASME A17.1 Safety Code for Elevators
& Escalators (PD010),
March 8-11 |
 |
Elevator Maintenance Evaluation
(PD107),
March 8-9 |
 |
Flow Induced Vibration with a
New Calculations Workshop (PD146),
March 10-12 |
 |
ASME A17.3 Elevator & Escalator
Code: ASME A17.1 Requirements for Alteration, & Existing
Installations (PD224),
March 10-11 |
 |
ASME A17.2 Escalators & Moving
Walk Inspection and Maintenance Evaluation Techniques (PD301),
March 12 |
 |
Elevator Control Technology
(PD344),
March 8-9 |
 |
Centrifugal Pump Design and Application
Seminar (PD349),
March 8-10 |
 |
Seismic Design and Retrofit of
Equipment and Piping (PD394),
March 8-11 |
 |
API 579: Recommended Practice
for Fitness-for-Service and Continued Operation of Equipment
(PD395),
March 10-12 |
 |
Failure Prevention in Steam Systems
(PD403),
March 8-9 |
 |
Turbo-Machinery Components and
System: Mechanical Design (PD433),
March 10-12 |
 |
Liquid Pipeline Hydraulics, Level
2 (PD434),
March 8-9 |
 |
B31.1 Fabrication & Examination
(PD445),
March 8-9 |
 |
Failure Prevention in Steam Systems
(PD403),
March 8-9 |
 |
Project Management for Engineers
(PD467),
March 8-10 (Save
10%) |
 |
ASME QFO Examination Preparation
(PD472)
March 10-12 |
| |
|
Houston, TX/March 22-26, 2004
Wyndham Greenspoint Hotel, phone (800) 996-3426 (reference code=ASME) |
 |
ASME B31.3 Process Piping (PD014),
March 22-25 |
 |
ASME Boiler & Pressure Vessel
Code: Section IX, Welding and Brazing Qualifications (PD190),
March 22-24 |
 |
Shock and Vibration Analysis (PD231),
March 24-26 |
 |
Practical Welding Technology (PD359),
March 24-26 |
 |
Operation, Maintenance and Repair
of Plant Piping Systems (PD398),
March 22-25 |
 |
The Layout of Piping Systems and
Process Equipment (PD401),
March 22-24 |
 |
Turbulance Modeling, Industry
Application (PD411),
March 22-23 |
 |
Lean Manufacturing: Designing
Manufacturing Cells (PD415),
March 24-25 |
 |
Design, Selection and Sizing of
Heat Exchangers (PD428),
March 24-25 |
 |
ASME Section VIII, Division 2
(PD448),
March 22-25 |
 |
Mechanical Tolerancing for Six
Sigma (PD449),
March 22-23 |
 |
B31.3 Fabrication and Examination
(PD457),
March 26 |
|
|
Marine Pipeline Engineering Course
The Houstonian Hotel, Houston Texas
April 6-9, 2004
20% Discount for
ASME Members
|
 |
Marine
Pipeline Engineering |
|
|
Orlando, FL/April 26-30, 2004
Grosvenor Resort, phone (800) 624-4109 |
 |
Failure, Failure Prevention &
Repair of Pressure Vessels, Piping, Boilers & Rotating Machinery,
with Life Extension Consideration (PD077),
April 26-28 |
 |
The Gas Turbine (PD115),
April 28-29 |
 |
Fracture Mechanics Approach to
Life Prediction (PD268),
April 26-28 |
 |
Fastening Systems (PD313),
April 26-27 (Save
10%) |
 |
Using Reliability Engineering
Principles for Improved Process Performance (PD335),
April 26-27 |
 |
ASME B31.8 Gas Transmission and
Distribution Piping Systems (PD370),
April 29-30 |
 |
Design of Bolted Flange Joints
(PD386),
April 28 |
 |
Feedwater Heaters (PD407),
April 26-27 |
 |
Combustion, Thermal Systems and
Multipollutant Control of Air Emissions (PD414)
April 29-30 |
 |
Thermoeconomics: Efficiency vs.
Cost (PD417),
April 29-30 |
 |
The Bolted Joint (PD446),
April 29-30 |
 |
Tools and Methods of Finite Element
Analysis (PD456),
April 28-29 |
|
|
|
|
 |
ASME B31.1 Process Piping (PD013),
May 17-21 |
 |
Heating Ventilating and Air-Conditioning
Systems: Sizing and Design (PD027),
May 17-19 (Save
10%) |
 |
Pump & Valve Selection for
Optimum System Performance (PD171),
May 17-20 |
 |
ASME Y14.5M Geometric Dimensioning
and Tolerancing: Level II (PD278),
May 17-19 |
 |
Understanding Chillder Performance,
Operation and Economics (PD387),
May 20 |
 |
The Layout of Piping Systems and
Process Equipment (PD401),
May 17-19 |
 |
Tolerance Stack-Up (PD402),
May 20-21 (Save
10%) |
 |
Repair & Alteration Section
VIII, Division 1 (PD441),
May 20-21 |
 |
ASME Boiler and Pressure Vessel
Code: Section VIII, Division 1, Design and Fabrication of Pressure
Vessels (PD442),
May 17-19 |
 |
Section VIII - 5 Days (PD443),
May 17-21 |
 |
Improving Working Relationships
for Engineers and Technical Professionals (PD466),
May 20-21 |
 |
Project Management for Engineers
and Technical Professionals PD467),
May 17-19 (Save
10%) |
 |
The Theory of Inventive Problem
Solving (TIPS/TRIZ) (PD471),
May 17-19 |
|
|
Las Vegas, NV/June 7-11, 2004
Alexis Park Resort, phone (800) 582-2228 (reference code=ASME)
|
 |
ASME B31.3 Process Piping (PD014),
June 7-10 |
 |
ASME Boiler & Pressure
Vessel Code: Section III, Division 1, Requirements For Design
And Manufacture Of Nuclear Power Plant Components (PD184),
June 7-10 |
 |
ASME Boiler & Pressure Vessel
Code: Section IX, Welding and Brazing Qualifications (PD190),
June 7-9 |
 |
ASME Boiler & Pressure Vessel
Code: Section XI, Inservice Inspection of Nuclear Power Plant
Components (PD192),
June 14-18 |
 |
How to Predict Thermal-Hydraulic
Loads on Pressure Vessels and Piping
(PD382)
June 9-10 |
 |
Non-Destructive Examination -
Applying ASME Code Requirements (Section V) (PD389)
June 14-16 |
 |
Seismic Design and Retrofit of
Equipment and Piping (PD394)
June 14-17 |
 |
Introduction to Piping Systems
and Process Equipment (PD410),
June 7-9 |
 |
The Bolted Joint (PD446),
June 7-8 |
 |
Advanced Pressure Vessel &
Fabrication, Section VIII, Division 1(PD447),
June 7-10 |
 |
B31.3 Fabrication and Examination
(PD457),
June 11 |
|

If you would like to bring a short course to your Section
contact Russell Girardi at girardir@asme.org
|